The Lifecote™ Group Nationwide
“ A Lifetime Promise of Protection”
 
 
   
Lifecote™ News

The Site

Lifecote™ News
 

Lifecote™  has purchased the intellectual brand rights to market and operate as Protectacoat.

Lifecote™  has completed a contract for a former British prime minister at his home residence.

Lifecote™ Group has won a £720,000 contract for the renovation of 350 properties, in the West Country leading to another 500 properties in the South East for a property management company.

Lifecote™ was the only contractor able to offer Structural repairs, Wall ties, Thor Helical, Dpc, Dry Rot elimination, kitchen installation, tiling and redecoration.

Chris & Scott Maynard feature on Wykamol news release Click Here
 
Lifecote™ continues to expand with the appointments of:

Paul Davis Managing Mid Wales

Tony Lane Managing Southern Ireland (Based in Dublin)

Both Tony and Paul are running Lifecote™  commercial, for project managed developments, and have a team of specialists under their direct management.

Lifecote™ welcomes Dave Risby and his team who will manage the Kent region.

Dave is an experienced structural builder who is conversant with all the current building regulations as well as a Damp Proofing, timber treatment and basement conversions.

Arron Love an experienced plasterer joins our North West team to assist with a substantial expansion in that location.

The Lifecote Group has just completed basement works to a well know, five Star, West End of London Hotel. This work was conducted under the management of Steve Hawes of our Greenford West London office.

Steve works from the Lifecote office based at Rockware Business Centre.

This is just another high profile installation which complements works at:

· Empire Casino Leicester square. Complete renovation and structural water proofing of basement, now the casino area.

· Works at Kate Winslets estate in Oxfordshire. Extensive dampness and dry rot works.

· Duke of Westminster Estates in Lancashire. Letros damp Proofing systems and membranes applied to listed buildings.

· 12 Luxury basement conversions in Berkshire. Valued at £25 million.

Clients chose Lifecote over a number of other high profile Nationwide brands simply because we have the resources and infrastructure to undertake any works without sub-contracting. Lifecote is a one stop shop, capable of project managing any size installation.

As part of our continued expansion we welcome the following experienced and respected area mangers:

Gary Moakes Sussex

Tim Briers Staffordshire & South Yorkshire

Chris Maynard Oxfordshire & Berkshire

Scott Maynard Buckinghamshire

James Cooper Hampshire & Dorset

Arron Goddard Norfolk

Karl Duncan Suffolk & Cambridgeshire

Billy Hunter Edinburgh

Farran Mackay Devon & Cornwall

 
Lifecote™ can now be followed on Facebook by clicking here

Customers and buyers should be aware that Proten Ltd has been in receivership and the company has been purchased for a token sum by its new owners.

Lifecote™ has frozen VAT; there will be no VAT increase this year.

Lifecote™ will essentially absorb the government increase.

Lifecote™ is emerging as a leader in the commercial market for structural concrete remedies, Basement Conversions, underground car Park water Proofing,toxic mould elimination and prevention in the work place.

Industrial, commercial hygiene and work place assessments, including risks and liabilities, are now available to corporate clients. In an ever changing world, toxic mould prevention is absolutely essential for the employer with increasing litigation and health issues in this specialist field.

  • Lifecote™ now offers a full 30 year guarantee for Water Proofing, Basement Tanking and external coating. Mostcompanies only offer 10 years so please check before buying!
  • Our guarantees are for both labour and materials. Please beware of guarantees that cover materials only.
  • Lifecote™ is expanding to Spain, France and Ireland.
  • Lifecote™ now offers Commercial Structural repairs and surveys in London, Essex and Hertfordshire.
  • Lifecote™ now undertakes all aspects of insurance work. This extends to flood damage, new Kitchens, roof repairs, full renovation, under pinning, and decoration in London, Hertfordshire and Essex. Click Here for more information.
  • Our customers may pay for services using their credit card. Please click hereto pay Lifecote™ .
  • Lifecote™ has launched 50 new websites across the UK to further promote and advertise our expansion.
  • Lifecote™ has openednew branches inScotland, Cornwall, Yorkshire and Lincolnshire.
Projects


Lifecote™ is undertaking the structural dampness elements of a complex of 12 separate one million pound basement units in one of the most exclusive locations in the UK. This process is called tanking and we are using our membrane solutions in this situation.

This is a £50 Million NHBC project with extensive customer assurances required.

Why did the Architects, banks and fund managers pick Lifecote™ ahead of others to undertake the works?

The decision was made after close scrutiny of the companies’ financial viability, quality of workmanship, technical supervision and ability to meet all current on site legislation and insurance.

If these institutions choose Lifecote™ then you should be reassured that your works would be completed to an exceptional standard, reputation is everything, customer satisfaction our priority.

Current Projects

This ten bedroom house in Hampstead North London had both penetrating and rising damp problems. Below shows how our skilled technicians made structural repairs using latest resin bonding material.

The house had a new Dpc (Damp proof course) injected at the wrong height by a competitor, who returned to report that there was no fault in their work and blamed condensation as the cause of the internal paint flaking and earth salts discharging from the render.

Lifecote™ injected a new Dpc at the right height both internally and externally. Next we stripped off the internal render and made good with a water proof mix of sand and cement. The work was backed up by the Lifecote™ 30 year guarantee.

The Repairs

Each Elevation was treated with Rain Stopper then painted by the Lifecote™ Team.

In this example below a company had actually injected a Dpc at the wrong height, installed small plastic air bricks and left a down pipe discharging against the wall. The ground level was also far too high. The work was undertaken by a Sub-contractor who had only one week training at the company.

Dpc Too High

Lifecote™ injected a new Dpc, installed two correct sized air vents and reduced the ground level. We also stripped off the internal render and more importantly eliminated Dry Rot which had been caused as a direct result of the Polish worker not taking the correct remedial action. You can see the Dry Rot Damage below.

New Air Bricks and remedial action


The Internal Dry Rot Damage


Dry Rot Damage

Lifecote™ recently undertook the structural water proofing and Timber preservation on a property adjacent to David Beckham’s neighbour’s in Sawbridgeworth, Hertfordshire.

Earth retaining walls were structurally water Proofed


All defective beams and Timber Cut Out


New Beams installed by the Lifecote™ Team


Insulation and plaster board


Joists are protected with DPc before insertion into walls

All work has an insurance backed guarantee for 30 years to include both labour and materials unlike other companies who supply materials only

www.tritonsystems.net  

 

For a survey please call the office on:

Free Phone 0800 043 2096  

7 Days A Week   9.00am Till 9.00 pm